Buyer Guides 2026-10-23 · 3 min read

Spare Parts for the First Container

The parts that stop a reefer working are rarely the ones buyers think of. A short list of what belongs in the first container.

What spare parts to order with the first container

The parts that stop a refrigerated truck are predictable: door seals, refrigeration unit filters and belts, controller sensors, and the small hardware that holds the body together. None of them are expensive at the factory and all of them are expensive at destination, where the nearest dealer may be a different country. A first order should carry roughly 3–5 % of the vehicle value in consumables and fast-moving parts — enough to keep the fleet running for a year without an air-freight shipment. This list is what we recommend including, and why each item earns its place.

The parts to include, in priority order

Part Quantity per 10 units Why it is on the list
Door gasket / seal set 10 sets First failure point on any body; degrades with heat, dust and use
Refrigeration unit filter drier 10 Replaced at every service; blocks moisture damage to the circuit
Refrigeration unit belt set 10 Cheap, and a broken belt stops the box immediately
Defrost heater and defrost sensor 5 each The most common cause of “box holds temperature empty, fails loaded”
Controller and thermostat sensor 5 Failure reads as a refrigeration fault; diagnosis is easier with a spare
Evaporator and condenser fan motors 5 each Heat and dust shorten motor life in hot markets
Door hinges and latch assemblies 10 sets Mechanical wear; usually replaced before the panel fails
Interior light and switch 10 Trivial cost, frequent failure, and drivers report it
Body bonding and sealing consumables 1 kit For local repair of impact damage to panels
Wheel-end and brake consumables Per chassis dealer Chassis-specific; order through the chassis brand’s local network

What the first container itself can carry, and how it is loaded, is covered in shipping a refrigerated truck from China to Africa.

What not to order

Do not order a spare compressor in the first container. Compressors fail far less often than the parts above, they are heavy, and if one is genuinely needed the failure is usually a symptom of a system fault that a compressor will not fix. Do not order complete panel sets either: damage is normally local, and a repair kit plus two spare panels of the most exposed size covers the realistic cases. And do not order parts for a model you have not yet commissioned — specifications change between production runs, and a gasket set for the previous design is dead stock.

How to make the parts list survive the first year

Three habits. Keep a parts register with the part number, the quantity received and the date each item was used, so the second order is driven by actual consumption rather than by guesswork. Photograph every failure before replacement — a photograph of a torn gasket or a blocked evaporator is what makes a warranty claim arguable. And agree the part numbering with the supplier at order time: if the gasket is identified only as “door seal for ZMS5040”, the second order will take three emails to place.

How we handle it

Every export order from our plant is shipped with a parts schedule matched to the model, and the part numbers are on the schedule rather than in a photograph. Bodies, panels and take-off parts are outside the CCC scope — CCC applies to complete vehicle models — so for body hardware the identification is our own part number, which we state on the packing list. Ask for the parts schedule with the quotation, not after the deposit.